Friday, July 8, 2011

Taping, Floating, Mudding...Part 2

The guys continued today to tape, float, and mud.  They finished all but a couple of places in the master bathroom.  Michael asked that they replace the sheetrock in the pantry corner that looked so horrible.  Yea...Done!  One less concern!   The other guys continued their exterior siding work.  Looks really good!  There is supposed to be a crew here on Saturday to sand the sheetrock and begin texturing the walls.  I spent some time today drawing a rough sketch of the bathroom shower tile design that I want, then faxed it to the builder.  They may start that work soon.  I hope my design will look ok...I just don't have any experience in tile lay-out design, and that's not something that's easily changed.  A roofing guy was out here today to look at the house to give our builder a bid on installing the metal roof.  His regular roofing crew is on vacation for several days.  So many things going on...progress, progress, progress!