Caulking for Painting...

After several days of quiet and inactivity out here...the crews arrived today and continued their work.  The stone guy finished the front porch columns and stone fireplace.  The framers worked on the back deck stairs.  Some of the guys continued hanging exterior siding.  The tile guy caulked the bathroom tile and began installing the bathroom shower floor tiles.  The paint crew began caulking for paint prep.  Lots going on...lots done!  Things are moving right along!